Hallway, bedroom, and bathroom

March 13, 2009 at 10:56 am Leave a comment

On Wednesday we started a hallway, master bedroom and small bathroom.  In the bedroom we had to take off the wallpaper, which led to extensive spackling to smooth out the walls.  Also the ceiling had moisture damage from the master bathroom, that needed to be scraped out and fixed.  The hallway and the small powder room were in much better shape and needed much less spackling.  

Advertisement

Entry filed under: Gallery. Tags: .

Hallway in Bala Friday finish

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Trackback this post  |  Subscribe to the comments via RSS Feed


Calendar

March 2009
M T W T F S S
     
 1
2345678
9101112131415
16171819202122
23242526272829
3031  

Most Recent Posts


Follow

Get every new post delivered to your Inbox.